1.When installing ,dismantling and moving the winch.It is necessary to kept stable and being not overly oblique without any clashes and fierce vibration.

2.Installation of winch
Its installation should be completed by professionals. The ground for installing the winch should be leveled off and much solid. The connection between winch and base should be reliable.

3.When mobile using ,fix the winch to timber sleepers block,and reliably and tightly connect timber block and chassis to ground anchor with steel wire rope . Be awake of avoiding looseness.

This installing method is suitable to winch being less than 3 tons.Concrete measurements for installation need to refer to such condition as soil quality,soil specific gravity and earth stamina,and are determined by ground anchor standard pictures appropriate to local use.