2014年7月31日星期四

The installation and testing for winch


1.When installing ,dismantling and moving the winch.It is necessary to kept stable and being not overly oblique without any clashes and fierce vibration.

2.Installation of winch
Its installation should be completed by professionals. The ground for installing the winch should be leveled off and much solid. The connection between winch and base should be reliable.

3.When mobile using ,fix the winch to timber sleepers block,and reliably and tightly connect timber block and chassis to ground anchor with steel wire rope . Be awake of avoiding looseness.

This installing method is suitable to winch being less than 3 tons.Concrete measurements for installation need to refer to such condition as soil quality,soil specific gravity and earth stamina,and are determined by ground anchor standard pictures appropriate to local use.















2014年7月29日星期二

The brief introduction crane parts in BEFANBY


The brief introduction crane parts in BEFANBY


Xinxiang Hundred Percent Electrical And Mechanical Co., Ltd is a leading manufacturer of overhead cranes, gantry cranes,winches,hoists,transfer cars etc,in China.The crane parts are also important products in our company, Here is a brief introduction of crane parts in our company,

The crane booms and end trucks are the main components of a crane.In our products list they are also important parts.Then the crane wheels and steel rails occupy a large place in the crane parts,
Last week we have a big order of crane wheels, he used the crane wheels for the ship.and he sign a two years contract with us,the crane wheels is used in many industry,

However, the crane hooks and crane trolley are the other component of cranes, and they also can used in many industry,BEFANBY company not only can supply the overhead cranes,gantry cranes,but also can supply the crane parts.

2014年7月28日星期一

Safety rules for lifting crane appliances


Safety rules for lifting crane appliances

For newly installed or after major repairing or changing the important performance cranesit  should be in accordance with the relevant provisions of the performance test before operation.

Crane should be taken a series of test before the formal operation,such as no-load transformer, lifting, rotating and running around and brake, limit switch, safety performance test etc.















The operator should be in close coordination with the signalman and obey the signalman's command with various gestures or signal contact. Whatever signal of the emergency stop, the operator should immediately stop during lifting operation

When lifting heavy objects, the crane hook wire rope should be kept vertical, it is forbidden to operate when the hook wire rope in the tilt state down drag lifting heavy objects. 























During the crane operation, it is forbidden to to walk under the crane and do repair work or touch wire rope and pulley, etc.

During the crane operation, it should have enough workplace and lighting equipment and keep a safe distance from buildings, so that it is no collisions occur at run time.


















2014年7月21日星期一

Basic maintenance method of the motor of winch


Basic maintenance method of the motor of winch 
















Motor is an important component of the winch, and the most expensive components, if damaged, it will cost more for maintenance. So BEFANBY company introduce some good maintenance method to customers .The maintenance method is describeas follows:














1. The working environment should be dry, and the motor surface should be clean, the air inlet should not be affected by dust, fiber, etc.
2.When the thermal protection of the motor continuous break down,you should check out why it is failure ,and then put into operation.

3.It is necessary to guarantee the motor in a good lubrication condition during running. Generally speaking after the motor running 5000 hours, you should replenish lubricant for the motor,

4.When the bearing is brokenit will make a lot of noise,it is time to check the bearing and change a new one.

5.It is OK to remove the motor from the shaft extension end or the stretching end when taking out the rotor.

















BEFANBY company wish this method will help you during maintenance winch motor 





2014年7月18日星期五

The Africa client visiting our factory for casted wheels, 2014.06.19.



The Africa client visiting our factory for casted wheels,  2014.06.19.

In the 19th June, We all nervous about client visiting for casted wheels. because it is the key moment for the business relationship between us in near future, but I do believe that prepare in advance is very important.So I see all the 120 emails between us and prepare all the things about the casted wheels may need tomorrow. 


















In the 10:27am, our manage Mr.Kevin drive a car to pick the client up in the train station,Our client walks to us and give me a warm hug, I know it is a good beginning,and I can see that our customer have a positive attitude to the casted wheels.Then we went to the factory, as soon as the client sees the wheel producing equipment,he calls his accountant and send us the 50% deposit. I finally have a relief.
























After checked the cased wheels he need, we walk around and see our other products,he is very interested in the gantry cranes and transfer carts,our client have a long conversation about the technique with our manager Mr.Kevin, it turns out they have a similar interest and a good knowledge of technique in equipment area,Whatever we have a happy day together,



The next day,we go shopping together,Our client really is a easy going man, we share our different cultures , of course, Chinese traditional food. Before he goes back to airport,he says that BEFANBY is a good company,and the casted wheels have a good quality.



















I believe that we have a bright future between us, especially after getting praise from our customers,and we will do better not only quality but also the after-sales.BEFANBY is going further on the foreign market.
                                                                                   Zora lou      


2014年7月17日星期四

Single girder overhead crane



Xinxiang Hundred Percent Electrical and Mechanical Co., Ltd is specialized in designing, manufacturing and selling crane lifting equipment in China.
Our products includes overhead crane, gantry crane, goliath crane, electric hoist, electric winch, jib crane, rail transfer cart etc.Our products have passed the authentication of Quality system ISO9001, and SGS, CE certifications. All of our products accord with machinery industrial standard GB/T14405-1993 and GB/T 14406-1993 















Single girder overhead crane, also known as electric overhead crane, workstation bridge crane. It is designs consisting of main girder, end carriages, electric hoist and electric appliance. 
This kind of crane is top running crane. The driving mechanism is installed on the end carriages. It drives the whole overhead crane travelling along the runways.
The single girder overhead crane can be control by cab control or ground control. The ground control includes pendant control and remote control.
Main parts
End beam: The main parts of the beam includes motor, reducer, wheels and brake. It also equipped with safety device, such as bumper, limited switch. It drives the whole crane traveling along the workshop.
Main girder: The main girder is box girder structure, no deformation
Limited switch: Ensure the security during the crane traveling
Bumper: It can reduce the impact force when two cranes crash or the crane contact with rail baffle.
Hand hole: It is convenient to install and maintenance of crane.
Bolts: It is used to connect main girder and end beam.
Rails:The rails for hoist traveling is paved under the main girder with I-beam.















Our commitment
1. The load bearing safety factor of the crane is no less than 120%.
2. Freely design the auxiliary device or foundation drawing, and offer the technical service and drawing material.
3. 16 hours engineering service and 24 hours internet service for our customers.
4. During the warranty period, if our products can't work normally, we can support you repair technology or replace relevant parts for you within 24 hours.
5. Solving the quality problem within 24 hours, serious attitude from beginning to end. Value the reputation and Preserve the image of our company.

2014年7月10日星期四

EOT gantry crane


















Heavy duty EOT crane is a heavy duty industrial lifting equipment. It is travelling along the plant. Double beam EOT crane consists of two main girders, end trucks, crane trolley and electric appliance.
The main girder is specially suitbale for lifting and transporting heavy duty loads. The end trucks joint ensures positive contact of four rail wheels.
The crane trolley with forged hook has heavy load lifting ability.















Parts
Main girder: The main girder is box girder structure, no deformation
Limited switch: Ensure the security during the crane traveling
Bumper: It can reduce the impact force when two cranes crash or the crane contact with rail baffle.
Hand hole: It is convenient to install and maintainace of crane.
Upper limited switch: It protects the hoist and security when the hoist up to limited place.
Left & right limited switch: It prevents the hoist traveling beyond the limited line.
Lifting hole: There is two lifting hole on the top of main girder, it is easy to lift when installation.
Capacity
T
10
16t/3t
5t/20t
32t/5t
50t/100t
Operational method
 
Cabin control
Speed
Main hook Lifting
A5
m/min
8.5
7.9
7.2
7.5
5.9
A6
13.3
13
12.3
9.5
7.8
Aux. hook Lifting
 
16.7
19.5
19.5
13.2
Cross travelling
43.8
44.6
44.6
42.4
38.5
Long travelling
A5
 
90.7/91.9/84.7
84.7/87.6
84.7/87.6
87/74.2
74.6/85.9
A6
115.6/116.8/112.5
112.5/101.4
112.5/101.4
101.4/101.8
86.8/87.3
Max. Lifting height
Main hook
m
16
16
12
16
12
Aux. hook
 
18
14
18
16
Working duty
 
A5 ,A6
Power supply
 
380V 60HZ 3phase AC
Span
m
10.5-31.
Recommend rail
 
43kg/m
43kg/m or QU70
QU80
QU70